Day 106 (September 11, 2010)

Radiator, fan, and transmission cooler were installed. 

Shifter was installed. 

Day 107 (September 12, 2010)

Fabricated, painted, and installed fuel cell protection shield. Installed cell mount. Fabricated and installed cell strap. 

Denny Crabill fabricated a fitting to connect the #12 water pump inlet to the radiator hose. 

Rob McCall worked on the grill. 

Calvin fabricated transmission cooler brackets and mounted the transmission cooler. 

Mounted fuel pump. 

Mom installed master cylinder. 

Calvin Installed master switch. Screwed in two plugs in the bottom of the engine. Ran coolant lines. Installed drive shaft. Installed front brake calipers. Placed lock washer on sub frame bolts. Tightened two nuts in steering linkage. Bolted down windshield. Tightened motor mount bolts. Ran transmission coolant lines. 

Day 108 (September 13, 2010)

Mom worked on hood scoop.

Finished fuel cell vent. Found and installed radiator caps. Tightened bulk head.

Day 109 (September 14, 2010)

Welded carburetor. Bolted down carburetor. Replaced upper A-arm bolts. Tightened tie rod ends. Replaced bolts in brake rocker.

Day 110 (September 15, 2010)

Painted bottom of door. 