Day 11 (December 19, 2009)

Worked on left front.

Day 12 (December 21, 2009)

Bent tubing for the cage. (14 bends) 

Welded in left cage extension and the forward hoop for the funny car cage.

Day 13 (December 22, 2009)

Welded in the right cage extension and the windshield bar.

Welded 2 pieces between the main hoop and the FC hoop.

Day 14 (December 23, 2009)

Left side door bar, sill bar, floor plate, and gusset bar on left side. Started work on forward strut and cut out left side of firewall.

Day 15 (December 24, 2009)

Made 6 pieces. Welded in left side X and front left strut.

Fabricated right strut. Clearanced the inner fenders and welded the front part of the right strut. Cut out right side of firewall.

Make a Free Website with Yola.