Day 111 (September 16, 2010)

Installed grill.

Day 112 (September 17, 2010)

Started fabricating the throttle linkage. (4 hours)

Day 113 (September 18, 2010)

Fabricated throttle linkage.  

Mounted switch panel. 

Ran brake lines. Installed seat belts. Bolted down seat. Installed front fender supports. Mounted line lock. Prepared slicks and front tires. Matt and Terry worked on the car.

Day 114 (September 19, 2010)

Installed fan belt. Finished dog box cover. Finished ignition system. Finished wiring car. Installed custom door handles. Made and installed radiator protector. Rob McCall was a huge help. Car was started for the first time. 

Day 115 (September 20, 2010)

Mounted battery. 

Modified brake travel limiter. Installed spring for brake pedal. 