Day 21 (January 2, 2010)

Welded (2) panels above rear and filler piece between frame and truck floor.

Measured headers (28.5”) and tacked tubes together. 

Day 22 (January 3, 2010)

Bernie welded rerouted header tube.

Day 23 (January 10, 2010)

Cameron made drawings for rear suspension brackets.

Day 24 (January 30, 2010)

Fabricated both fire cones and fabricated the left side collector.

Day 25 (January 31, 2010)

Finished right side header.

Make a Free Website with Yola.