Day 36 (May 7, 2010)

Welded on the halo bars. 

Welded the left side exhaust secondary piping to the Y-pipe.

Day 37 (May 8, 2010)

Welded on the rear housing brackets. 

Worked on left frame rail. Cut off excess metal under left side. Made control arm brackets for the left side. Cleaned floor under area where new frame connector will be installed. Scraped undercoating on inner fenders.

Day 38 (May 11, 2010)

Welded the left frame rail and suspension brackets together and installed in the car.

Day 39 (May 12, 2010)

Made wood ‘jig’ for locating the suspension brackets.

Day 40 (May 13, 2010)

Welded box end on 2” x 3” frame and right rear lower outer bracket.

Make a Free Website with Yola.