Day 41 (May 30, 2010)

Installed 2nd right right rear lower bracket (inner).

Day 42 (May 31, 2010)

Installed exhaust hanger. Installed floor between driver area and right side X. Removed undercoating from inner fenders.

Day 43 (June 12, 2010)

Fabricated and welded 4 pieces for 3rd link at the cross member, 4 pieces for roll cage at shoulder bar, and 2 pieces at right sill.

Day 44 (June 13, 2010)

Fabricated and welded seat belt mount and center piece for the rear bulkhead.

Day 45 (June 15, 2010)

Fabricated and welded in right side floor panel.