Day 51 (July 10, 2010)

Reinforcement plate was welded to the upper foot well (Left side) to support the brake pedal pivot. 

Trunk pieces were welded in. Rear tubs in trunk area were made and left side was welded in. 

Day 52 (July 11, 2010)

Right side wheel tub was installed. 

Inside of the trunk lid was stripped. 

Mom stripped the hood. 

Foot well floor pan was installed and the foot brake clearance pocket was notched into the left front outrigger. 

Firewall fabrication was started. 

Day 53 (July 12, 2010)

Firewall fabrication continued. 

Day 54 (July 13, 2010)

Rear bulkhead and trunk welding was completed. 

Rear inner fender scraping was completed. 

Firewall work continued. 

Painted area behind driver.

Day 55 (July 15, 2010)

Welded the brake pedal. 

Continued welding the firewall. 

Paint stripping continued. 