Day 56 (July 16, 2010)

Inside the trunk old paint was stripped. 

Panel from dash bar to original dash was installed. 

Small holes in rear courter were welded. 

Calvin started fabricating the pan hard bar piece for rear. 

Day 57 (July 17, 2010)

Pan hard bar support for the car side of the link was fabricated and welded into the car. 

Car was installed onto the rotisserie. Underside cleaning and trimming followed. 

Day 58 (July 18, 2010)

John Valentine brought over left door which he had appropriately gutted. 

Trimmed excess metal under car.

Calvin ground left inner fender.

Cameron chiseled away sound deadener on right inner fender.

Cameron ground more metal on left inner fender and left front frame rail.

Day 59 (July 19, 2010)

John worked on trunk lid. He removed the hinge plate and stripped the rest of the paint.

Day 60 (July 20, 2010)

Ground metal in engine bay. 

Cleaned and primed inner left fender, dash and cowl.

Make a Free Website with Yola.