Day 6 (November 28, 2009) 

Went to Krietz Creek flee market. Cleaned the roll bar up. Primed the roll bar and the rear end.

Day 7 (November 29, 2009) 

Dad started fabricating the rear frame rails.

Day 8 (November 30, 2009) 

Cameron ground some metal.

Dad drilled hole in cross member.

Dad double checked measurements and realized that the rear frame rails were two inches too long. 

Dad welded in rear cross member and the right rear frame rail. End of frame rail was cut.

Day 9 (December 6, 2009) 

Worked on left rear frame rail and both rear kick down sections.

Day 10 (December 12, 2009) 

Worked on shock mount/ cage rear struts. (11 pieces)