Day 46 (June 18, 2010)

Fabricated front portion of rear wheel tubs and welded into the car.

Day 47 (June 19, 2010)

 Welded in X-bar panel. 

Added filler panels between center piece and wheel tubs in rear firewall.

Moved car from stands and did mock up.

Added right side cowl stiffener. 

Day 48 (July 4, 2010)

Mom cleaned seat. 

Made a clearance area in rear end housing back brace in order to allow coil spring to pass vertically. 

Cameron and Calvin scraped inside of front fenders. 

Cameron made pattern and laid it out on tin for rear inner tub vertical panel. 

Day 49 (July 5, 2010)

Three pieces of roll bar tubing were used to make the three link suspension. 

Three links were tack together.

Rear upper spring mounts were made. 

Made jig that was tacked to the car that held the header to stay in place while engine was out in order to allow the installation of the firewall. 

Day 50 (July 8, 2010)

Cameron cut out 4 pieces for trunk floor. 

Calvin stripped paint off of trunk lid.